During week 2-3 not a lot was happening that could be shown with photographs. The rough electrical work has been completed and it's now in a holding stage awaiting inspections.
It's been an adjustment having no kitchen or a living room. At first I felt a bit out of sync between the hours of 6:00 - 8:30 as this was the time I typically spent in those rooms.
The other adjustment was eating. I'm not too big on eating out so I'm trying to keep that to a minimum. I have a temporary kitchen setup in a room already cramped with a bunch of stuff formerly in the kitchen or living room. I've got just a bit enough path for me to get to the fridge and table.
Look closely and you'll see a microwave and toaster oven on the left and my refrigerator on the right. The table is filled with some dry goods, paper plates, plastic silverware and cups. A small corner is left over for actual meal prep.
Most of my meals end up cooked on the grill. Although it hasn't been a big problem, there are some challenges associated, mainly with cleanup. I'm currently washing dishes with the garden hose which requires me to finish dinner before its too dark!
Up next is the flooring finish and some drywall work. I should have some interesting pics with the next post.